An approved sample proves what a line can do on a good day, not what production will do on a normal day. The first commercial run is where the approved sample meets that normal day. Seven things have to be fixed in writing, each with one signatory.
What the evidence shows
Codex fixes the measurements a lock-off has to reference. Declared net contents of a glazed product exclude the glaze (CXS 92-1981, §6.2), with a defined de-glazing method (§7.3.2) and a cook to 65–70 °C internal temperature (§7.6). A breaded product declares its fish content, measured by a stated method (CXS 166-1989, §6.1, §7.4). Lots carry an establishment number, country of origin and packing date (CXC 52-2003, §7.10), and validation is required when a significant change is planned (§5.3.8). No Codex text prescribes a lock-off. The seven locks, their owners and their signatures are Ecosea’s process.
Table of Contents

Approval proves a sample, not a line
The sample that gets approved is the best artefact the project will ever hold. It was made with attention, on a line that knew it was being watched, from material someone selected. Approval records that one batch, on one day, met the panel’s view of the brief.
The commercial run begins the next morning. The line returns to its normal speed. Raw material arrives from the next lot, the next container or the next supplier. A coating mixer is refilled, a fryer drifts two degrees, a film supplier changes a layer, an artwork file is updated for a promotion. None of these is a scandal. Each is enough to make the packed product a different product from the one that was signed.
The gap is not usually a bad factory. It is an undocumented handover. The sample was approved as an object, and production needs a set of instructions, a retained reference and a rule about who may change them.
- Group 01ReferenceGolden sample and specification version. What production has to match.
- Group 02Recipe and processRaw material grade and origin, coating pickup, cooking validation.
- Group 03PackFilm structure, print and artwork version, lot-code position.
- Group 04RuleChange control: who may reopen a lock, and with what evidence.
Seven locks between an approved sample and production
A lock is a decision written down with a version, an owner and evidence that can be checked at the factory gate. Seven are enough for a first production run. The six gates of a direct-development programme take a brief to commercial validation; the seven locks sit between the sample gate and the trial run, where the specification is written.
1. The golden sample and its storage. Two units from the approved batch, sealed, labelled with brief and sample version, and held at −18 °C or colder — one at the buyer, one at the factory. A photograph is not a reference; an unlabelled bag in a freezer is not either.
2. The specification version. One controlled document with a version, a date and an approval block, plus annexes for the coating, the raw material and the pack. Anything not in the document is a preference, not a requirement.
3. Raw material grade and origin. Species, size or count, glaze, catching or farming method, origin and the certificate that supports it. “Shrimp” is not a raw material specification.
4. Coating pickup and application. The declared pickup with its tolerance, the batter or breading specification, the oil, and the method used to measure pickup on a finished unit. Pickup changes net weight, cost per kilo and the eating result, which is why it cannot be left to the line’s habit.
5. Cooking validation. Core temperature, time, equipment, load and yield, recorded on the actual product rather than on the factory’s standard item. Codex’s cook is a starting point, not a validation: it says the exact conditions should be set by prior experiment.
6. Pack and artwork version. Film structure, print process, label data, lot-code position and the artwork file number. A new film or a corrected label is a new pack, even when the product inside is identical.
7. The change-control rule. Who may approve a change, what triggers re-approval, and what evidence the change has to carry. This is the only lock that keeps working after the first container ships.
| Lock | What is fixed | Signed by | Evidence on file |
|---|---|---|---|
| 1 Golden sample | Two retained units with brief and sample version | Buyer technical lead | Sealed unit at each site, storage log |
| 2 Specification | Controlled document, version and annexes | Buyer technical lead | Approved version with date and signatures |
| 3 Raw material | Species, grade, glaze, origin, certificate | Factory quality manager | Supplier specification and lot certificate |
| 4 Coating | Pickup with tolerance, recipe, oil, measurement method | Factory quality manager; ingredient supplier for its annex | Pickup record on finished units |
| 5 Cooking | Core temperature, time, equipment, load, yield | Factory quality manager; accepted by buyer | Validation run record on the product |
| 6 Pack and artwork | Film, print, label data, lot-code position, file number | Packaging and artwork owner | Approved artwork file and print proof |
| 7 Change control | Triggers, approver, evidence required | Commercial owner | Signed rule referenced in the purchase order |
Who signs each lock
The signature is the part that survives staff turnover, so it should sit with the person who can see the consequence.
The buyer’s technical or QA lead signs the golden sample and the specification version, and accepts the cooking validation. That is the same person who will be asked, eighteen months later, why the product on shelf is not the product that was approved.
The factory’s quality manager signs raw material grade and origin, coating pickup and application, and the cooking record. These are process facts the factory owns; a buyer can require them but cannot verify them from an office.
The ingredient or coating supplier signs its own specification, which is annexed to lock four. Its declaration covers particle size, allergen status and the method for measuring what it sells.
The packaging and artwork owner signs lock six, with the artwork file number on the approval record. A label approved by email is a label nobody can prove was approved.
The commercial owner signs the change-control rule. Not because commerce decides quality, but because the pressure to change something late — a cheaper film, a different origin, a revised portion count — arrives through the commercial conversation, and the rule has to be visible where that conversation happens.
The change-control rule is the one that keeps working
Write the rule as a list of triggers, not a principle. A new raw material supplier or origin. A new batter or breading recipe. A new line, fryer or freezer. A new film, pack size or artwork version. A new cooking method or a change in validated load. Any of these reopens the lock that covers it and requires the evidence again.
Then add the sentence that makes the rule real: no purchase order for a changed product until the re-approval record exists, naming the person, the date and the change.
Two failures are common. The first is treating a like-for-like substitution as no change at all; a different origin is not like-for-like until the specification says which attributes may differ. The second is letting the factory approve its own change because the buyer was on leave. Both produce the same outcome: a commercial run that meets a specification nobody agreed to.
What to do next
- Hold a lock-off before the first purchase order. One meeting, seven rows, seven names. If a row has no evidence, it is not locked, and the first run is a trial rather than a production run.
- Sign the golden sample into the specification. Record its version on the approval page and store a second unit at the factory. The reference has to exist where the product is made.
- Write the change triggers before anyone needs them. A rule written after the first substitution is a negotiation, not a control.
The retailer specification is where these locks become clauses, and the quality-control gap is where the signatures move when a buyer goes direct. Approving a sample is a decision about one batch. Locking it is the decision that makes a production run repeatable — or reveals, before the container is booked, that it will not be.
Before the first purchase order
Approved a sample and booked the run? Ecosea can run a seven-lock review against the specification, the golden sample and the production record.
References
- Codex Alimentarius Commission. (1981). Standard for quick frozen shrimps or prawns (CXS 92-1981, revised 1995, amended 2014). Food and Agriculture Organization of the United Nations; World Health Organization. https://www.fao.org/input/download/standards/107/CXS_092e.pdf
- Codex Alimentarius Commission. (1985). General standard for the labelling of prepackaged foods (CXS 1-1985, amended 2010). Food and Agriculture Organization of the United Nations; World Health Organization. https://www.fao.org/input/download/standards/32/CXS_001e.pdf
- Codex Alimentarius Commission. (1989). Standard for quick frozen fish sticks (fish fingers), fish portions and fish fillets — breaded or in batter (CXS 166-1989, amended 2014). Food and Agriculture Organization of the United Nations; World Health Organization. https://www.fao.org/input/download/standards/112/CXS_166e_2014.pdf
- Codex Alimentarius Commission. (2003). Code of practice for fish and fishery products (CXC 52-2003, as revised). Food and Agriculture Organization of the United Nations; World Health Organization. https://www.fao.org/input/download/standards/10273/CXP_052e.pdf



