Opens in a new tab

A Claim Is Decided on the Day of Receipt.

A seafood claim inspection is decided on the day of receipt: by the time the argument starts, the evidence is either in the file or it is gone.

What the evidence shows

Read on 1 November 2026: CXS 92-1981, CXS 190-1995 and the Codex Code of Practice for Fish and Fishery Products. The shrimp standard defines a defective unit against a measured surface area and sets lot acceptance against a sampling plan, which is what makes a claim arguable rather than a matter of opinion. No claim file, laboratory report or rejection notice was available. This is an evidence practice, not a legal position.

Seafood claim inspection: a gloved worker holding a whole fish beside a vacuum-packed bag

The photographs that prove nothing

The pallet is opened in week six. There are photographs of thawed product on a stainless bench, a paragraph about how it looked on arrival, and a request for credit. The supplier answers with a photograph of the same product at packing, taken under different light, and a sentence about handling.

Both parties are telling the truth about what they can see. Neither has the evidence that would settle it, because the only moment when the product’s condition could be recorded cheaply has passed. A photograph taken after opening records what the product looks like now. It does not record what arrived.

The first hour of a seafood claim inspection

A claim is built in the first hour, by someone who is not yet angry and does not yet know whether there is a claim at all.

Photograph the pallet, the carton and the seal before anything is opened. Transcribe the lot code and the production date from the carton rather than the invoice. Take the product temperature between packs with a calibrated probe and write down the reading and the time. Ask for the container or trailer download the same day, while the carrier still has it. Weigh a sample of cases on the method named in the specification. Hold two unopened cases as retained samples, label them, and keep them at −18 °C or colder for at least as long as the Code of Practice expects production and distribution records to be kept — beyond the shelf life of the product (Codex Alimentarius Commission, 2003, section 3.7). Keep the delivery note and the carrier documents with the photographs.

None of this is investigative. It is the routine that makes an investigation possible.

  • Pallet, carton and seal, photographed before opening. One file, with the delivery note, before anything is cut.
  • Lot code and production date. Transcribed from the carton, not from the invoice.
  • Product temperature. Taken between packs with a calibrated probe; the reading and the time written down.
  • Container or trailer download. Requested the same day, while the carrier still holds it.
  • Weight of a sample of cases. Gross and net, on the method named in the specification.
  • Two unopened cases retained. Labelled, stored at −18 °C or colder, kept for the period the agreement states.
  • Delivery note and carrier documents. Filed with the photographs, not in a separate folder.
Seven captures in the first hour; every later step depends on one of them. Ecosea checklist; temperature follows the Codex standards cited in the text.

What the specification says the deviation is

A claim has to name a clause. CXS 92-1981 defines a defective unit against measured conditions — dehydration over a stated share of the surface, for one — and sets lot acceptance against a sampling plan at AQL 6.5 (Codex Alimentarius Commission, 1981, sections 7.1 and 8–9). That structure is what makes a claim arguable: the question becomes whether the lot fails the clause, not whether the buyer liked the product.

If your specification is silent, the argument is about adjectives. If the approval file never asked the supplier for lot-level records, the request will be new to them, which is one of the questions that belong before approval rather than after a rejection. “Excessive ice” and “poor appearance” cannot be settled by two people looking at the same bench.

The method matters as much as the clause. CXS 92 removes glaze on a sieve and drains it for two minutes; CXS 190-1995, for fillets, sprays the product and pats it dry (Codex Alimentarius Commission, 1981, section 7.3; Codex Alimentarius Commission, 1995, section 7.3.1). Two laboratories, two methods, two answers to the same question. If your specification names neither, you have agreed a number without agreeing how to find it.

Handling or production?

The record usually points one way before anyone has formed a theory. The question is whether the pattern follows the load or the lot — where the cartons sat, and when they were made.

Points to handling

What happened after dispatch

  • A temperature record with a gap, or a reading taken in the wrong place.
  • Damage or refreezing confined to cartons at the door end of the load.
  • One carton affected on an otherwise sound pallet.
  • Weight loss consistent with dehydration on the outer layer.

Points to production

What happened before dispatch

  • The same deviation repeats across cartons and pallets from one lot.
  • The retained factory sample shows the same condition.
  • Net weight or glaze outside the specification at packing.
  • The pattern follows a production date, not a position in the load.
Neither column is a finding. They decide which question is asked first, and which record is requested. Ecosea diagram; qualitative, no defect rates.

Neither column is a finding. They are the first two questions to ask, and the answer comes from the record, the retained sample and — where the specification requires it — a laboratory.

A useful discipline is to describe the pattern before opening the specification. Write down what is affected, where those cartons sat in the load, and whether they share a production date. That description is cheap, hard to argue with later, and it often tells you which column you are in before anyone has formed a theory.

The clock

  1. Day 0 · holdStop the lotNothing leaves the site. Photograph, probe, weigh and retain before anything else is opened.
  2. Day 1 · noticeWrite to the supplierThe clause, the quantity, the evidence held, and a request for the factory’s records for the lot.
  3. Day 3 · samplesSend the sampleLaboratory or trained panel, using the method written into the specification.
  4. Day 10 · comparePut the records side by sideFactory lot record, temperature download, carrier document, inspection report.
  5. Day 30 · settleReach a commercial outcomeCredit, replacement or a documented dispute, as the agreement provides.
  6. Day 60 · closeChange somethingThe specification, the receiving routine or the supplier review — or the claim taught nobody anything.
Your agreement sets the window; this diagram only shows that every step needs a date. Ecosea diagram; not a statutory timetable.

Day zero is the hold. Nothing leaves the site, and nothing is opened that does not have to be. Day one is the written notice: the clause, the quantity, the evidence you hold, and a request for the factory’s records for the lot. Day three is the sample going to the laboratory or the panel, by the method in the specification. Day ten is the comparison of records. Day thirty is the commercial outcome, whether that is a credit, a replacement or a documented dispute. Day sixty is the close: the specification, the receiving routine or the supplier scorecard changes, or the claim taught nobody anything.

The dates are a working sequence, not a statutory timetable. What matters is that each step has a date, because an evidence pack without dates is a folder.

What this is not

This is an evidence practice, not a legal position. Nothing here says whether a product was safe, whether a claim will succeed, or what a contract requires; those are questions for your quality team, your importer and your counsel.

It is also not a reason to reject more. A well-built file often shows that the product was within specification and the handling was not, which is an uncomfortable answer and a useful one. The purpose of the evidence is to make the answer visible, not to make it favourable.

What to do next

  1. Write the inspection method into the specification before the first order. A clause without a method is a number without a home.
  2. Photograph before opening. Pallet, carton, seal, label — in that order, and in one file with the delivery note.
  3. Hold retained samples for the period your agreement states. A sample that was discarded cannot be tested.
  4. Notify in writing inside the window, even before the investigation ends. A notice that states what you know and what you are checking preserves the argument without pre-judging it.

A claim is not won in the meeting. It is decided at the back door, in the first hour, by whether someone wrote down the lot number and the temperature — and whether the arrival record was already a habit before anything went wrong.

Before the first container

Testing a direct programme? Ecosea can help define the specification, qualify the factory and run a sample against it — so the comparison starts from a real product.

Talk to Ecosea

References

  1. Codex Alimentarius Commission. (1981). Standard for quick frozen shrimps or prawns (CXS 92-1981; revised 1995). FAO/WHO. https://www.fao.org/input/download/standards/107/CXS_092e.pdf
  2. Codex Alimentarius Commission. (1995). Standard for quick frozen fish fillets (CXS 190-1995; amended 2014). FAO/WHO. https://www.fao.org/input/download/standards/115/CXS_190e.pdf
  3. Codex Alimentarius Commission. (2003). Code of practice for fish and fishery products (CXC 52-2003). FAO/WHO. https://www.fao.org/4/a1553e/a1553e00.pdf

Related posts