A 90-Day Pilot Tests Whether You Can Repeat the Order

Two order cycles, five measures and pass/fail rules agreed before the first purchase order. Protiviti’s retailer shows how much sequence a capability build needs, and why a pilot is not a small container.

What the evidence shows

Protiviti’s client story describes a large US retailer building supplier onboarding, customs compliance and nationwide distribution in under six months, against estimates of at least 18 months. It is consultant-authored, self-reported and names neither the client nor a cost. The 90-day plan below is Ecosea’s proposal, not Protiviti’s method.

pilot — A 90-Day Pilot Tests Whether You Can Repeat the Order

A pilot is not a small order

A pilot is usually described as a smaller purchase: one container, two SKUs, a limited market. That description measures the shipment. It does not measure the thing that decides whether direct sourcing works, which is whether the organisation can place the order again without rebuilding the process.

One delivered container proves that a shipment can arrive. Two order cycles prove that specification, order, clearance, receipt, sale and reorder can run in sequence with the same people and the same documents. A pilot that ends at the first delivery answers a question nobody was asking.

The design follows from that. If the test is repetition, the pilot needs a baseline, a frozen specification, two cycles, and measures agreed before anyone sees a result.

What the case shows about sequence

Protiviti’s account, published in 2018, describes a large US retailer that set out to build a global supply chain capability: new overseas suppliers for more than 100,000 parts, customs compliance and nationwide distribution, inside a six-month deadline. Others had estimated at least 18 months, probably closer to two years.

The work was split into “four separate work streams focused on procurement, customs, distribution and systems development” (Protiviti, 2018). Supplier due diligence came before purchase orders. Tariff classification came before entry. Distribution capacity came before launch.

The account reports that the capability launched in less than six months and that 99.9% of the products ordered from the new overseas suppliers cleared customs and reached service centres in the initial eight US markets on schedule. The client is unnamed, the account is consultant-authored, the outcome is self-reported, and the subject is parts rather than seafood. It establishes a sequence, not frozen-seafood economics.

The six months is the useful warning. A 90-day pilot cannot build an import capability from nothing. It can test whether one exists, or expose the work stream that is missing before a container is committed.

  1. 01Due diligenceNew vendors validated for quality and delivery before contracts.
  2. 02Classification and entryParts classified, paperwork built and a freight broker engaged before shipment.
  3. 03DistributionA 4PL selected to manage 3PLs and scale with volume.
  4. 04SystemsRequirements, test scripts and acceptance testing run in parallel.
  5. 05LaunchFirst tranche to the initial eight of 16 US markets, on the original schedule.
  6. 06RolloutDistribution to 11 of the 16 markets complete at the end of the project.
The sequence, not the speed, is what transfers: suppliers before orders, classification before entry, capacity before launch. Ecosea diagram from Protiviti (2018); self-reported, client unnamed, non-food. No cost is disclosed.

The ninety days, phase by phase

Days 1-15: baseline and SKU selection. Record what the incumbent supply costs per kilo landed, and how it has performed on delivery, claims and fill, on the same basis you will use at day 90. Then choose two or three SKUs: one origin, one factory, one pack, one count band, with enough volume to fill an order twice. Fix the baseline first and choose the SKU second.

Days 16-45: specification, factory qualification, sampling. Freeze specification version 1, with a test method for every clause that carries money. Qualify the factory on certification, audit history, capacity, raw-material source and traceability. Sample against the specification and test glaze and net weight, count, cook loss and microbiology. Ask for the price against the version, not against the conversation.

Days 46-75: trial order and entry. Place the order on the frozen specification. Run entry documents, pre-shipment inspection, sailing, clearance, receipt, intake test and first sale. Record each exception when it happens; a review reconstructed afterwards records what people remember instead.

Days 76-90: review and repeat-order decision. Compare the five measures with the day-15 baseline and decide one of three things: repeat, fix a named defect and repeat, or stop. The decision is whether to place the second order, not whether the first container sold.

  1. Days 1-15Baseline and SKU selectionIncumbent landed cost per kilo and service record written down; two or three SKUs, one origin, one factory, one pack.
  2. Days 16-45Specification, factory qualification, samplingSpecification version 1 frozen with methods; factory qualified; samples tested; price quoted against the version.
  3. Days 46-75Trial order and entryOrder placed, documents filed, inspection passed, goods cleared, received, tested at intake and sold.
  4. Days 76-90Review and repeat-order decisionFive measures compared with the baseline; repeat, fix and repeat, or stop.
Four phases and one decision, with the pass rules fixed before phase one. Ecosea proposal; no phase is sourced from the case. Day counts are working days from the pilot’s start, not from the order.

Five measures, agreed before day one

The five measures are Ecosea’s proposal. What matters is the order of events: thresholds are written and signed by the commercial, technical and accounting leads before the first request for quotation, so the pilot cannot be judged on a measure invented after the result.

The scorecard: five measures and what a pass looks like
MeasureWhat it measuresWhat a pass looks like
Landed margin per kiloSales per kilo of shelf-ready product, less goods, freight, duty, entry, inland transport and intake loss, on de-glazed net weightEvery line is evidenced by an invoice rather than an estimate, and the result meets the case approved at day 15 on the same specification.
OTIFOrder lines delivered complete, to the agreed place, on the agreed dateBoth cycles complete; any miss is notified before the due date and traced to a cause outside the supplier’s control.
Claim rateClaims per 1,000 kg received, split by cause: specification, transit, documentationNo claim on a clause the frozen specification made testable at intake; every claim closed with a root cause and a corrective action.
Fill rateKilos shipped against kilos confirmed on the order; substitution counts as shortfall unless approved in writingNo undeclared shortfall and no unapproved substitution in either cycle.
Time from brief to shelf-ready SKUWorking days from the approved brief to the first sellable unit: specification, sample approval, artwork, item set-up, first receiptThe second SKU is faster than the first with the same team, which shows the process did the work rather than the effort.
A pass is a repeatable process, not a good container. Ecosea proposal; thresholds are qualitative by design because no public benchmark exists for this specification, volume and route. Set the numeric level from your own baseline.

Two design notes. Landed margin per kilo is measured on de-glazed net weight, because a price per kilo of glazed product is not the price of shrimp; Codex requires the declared net contents of glazed product to exclude the glaze (Codex Alimentarius Commission, 1981, §6.2). And time from brief to shelf-ready SKU is the only measure that tests the organisation rather than the supplier: a second SKU that takes as long as the first means the process did not learn.

What 90 days cannot prove

The window is a management constraint, not a shipping one. On a long-haul lane, the second container will not be sold inside 90 days, so day 90 can decide only whether to place the repeat order on the same specification and price, using documents that already worked. If that is not enough, the pilot needs 120 or 150 days, and saying so at the start is cheaper than redefining success at the end.

A quarter of one year cannot establish seasonality. One factory cannot establish a supplier base. And a pilot cannot prove a saving: it can prove a repeatable cost, on one specification, at one volume, with the entry work done.

What to do next

  1. Write the five measures and their pass rules before the first request for quotation, and have the commercial, technical and accounting leads sign them. A threshold agreed after the result is a negotiation, not a test.
  2. Pick two or three SKUs, one origin, one factory, one pack. Narrow enough that a failure has a cause you can name.
  3. Book the day-90 decision meeting now, with the people who can stop the programme in the room. If nobody can say no, the pilot is a formality.

A container can be bought once with effort. A programme is bought twice, with the same effort, by the same people, at the same cost. The pilot’s job is to find out which one you have.

Ecosea coordinates seafood product development with factories and ingredient partners, then supports specification, factory qualification, sampling, quality and execution. If you are scoping a first order, we can help define the specification and the evidence the pilot will be judged on.

Before the first purchase order

Scoping a pilot? Ecosea can help define the specification, qualify the factory and run the samples the five measures depend on, so day 90 is a decision, not a debate.

Talk to Ecosea

References

  1. Codex Alimentarius Commission. (1981). Standard for quick frozen shrimps or prawns (CXS 92-1981, revised 1995). Food and Agriculture Organization of the United Nations; World Health Organization. https://www.fao.org/input/download/standards/107/CXS_092e.pdf
  2. Protiviti. (2018, July 12). U.S. retailer launches global supply chain capability in record time. https://www.protiviti.com/us-en/client-story/us-retailer-launches-global-supply-chain-capability-in-record-time