Change Supplier Without a Gap on the Shelf

The switch is not a purchase order. To switch seafood supplier you need a specification freeze, a sample approval, an artwork proof and a stock plan — and the last one decides whether the shelf stays full.

What the evidence shows

Read for this piece: CXS 1-1985 for the definition of a lot and the content of a label, CXS 92-1981 for the shrimp label, CXC 52-2003 for lot identification and record retention, the FDA Food Labeling Guide on who approves a label, and the ICC Incoterms 2020 summary on cost and risk. None of them sets a transition timetable. The sequence and the run-down rules below are Ecosea’s method.

Switch seafood supplier: pallets of cartons on warehouse racking

Freeze the old specification first to switch seafood supplier

A familiar switching failure happens before the first order. The old specification was never frozen, so the new sample is approved against memory, and the argument about what changed begins after the old line has stopped.

CXS 1-1985 defines a lot as “a definitive quantity of a commodity produced essentially under the same conditions” (Codex Alimentarius Commission, 1985, §2). A new factory is a new lot by definition, and a new label is a new pack identity even when the product inside is identical. That is why a supplier change is a records problem as much as a purchasing one: the old lot, the new lot and the label versions all have to be findable afterwards.

Freeze four things before the brief goes out: the specification version, the approved sample that version refers to, the current label artwork and its proof, and the list of fields that are not allowed to change. Then give each one an owner. A frozen specification is not bureaucracy; it is the only way the new sample can be judged against something other than the last good delivery. The case for a versioned sample and a named signatory is in who signs for quality when the importer leaves; the case for a clause with a method is in writing a specification that can be tested.

The sequence

  1. Gate 1Decide and freezeOld specification version, approved sample, current label. One owner per item.
  2. Gate 2Approve the new sampleJudged against the frozen version, not against the last delivery. Record the differences.
  3. Gate 3Artwork and proofWho owns the plate, who signs the proof, which label version goes to print.
  4. Gate 4Order and coverPurchase order, stock cover and a written run-down plan for the old lot.
  5. Gate 5First productionPre-shipment check against the same specification and the approved sample.
  6. Gate 6Release and cut overQuarantine release, old-label run-out, shelf and customer change.
The order matters more than the speed; the point of no return is the plate. Ecosea diagram; no durations shown.

The order matters more than the speed. Gate two is where the risk sits, because a new sample approved against an unfrozen specification will pass. Gate three is where the money becomes difficult to recover: once the plate is ordered and the press is set, the label is no longer a draft.

The point of no return is not the first delivery. It is the earlier of two commitments: the plate order and the purchase order. After that, the old product and the new product are both in the system, and the only remaining decision is how to run one out without running the other in.

Who owns the plate and the proof

A label change is a small project with three owners, and buyers discover that nobody has named two of them.

The brand owns the artwork and the claim it makes. The printer or converter owns the plate, the colour standard and the proof it produces. The retailer or brand’s regulatory or quality function signs the proof that goes to print. The factory prints what it is sent. When the artwork is wrong, the factory is blamed; when the plate is wrong, the printer is blamed; when the proof was never signed, nobody is.

There is no external approval to wait for in the United States: the FDA states plainly that it “does not pre-approve labels for food products” (U.S. Food and Drug Administration, 2013). That removes an excuse and adds a duty. The label gate is internal, so the only defence is a versioned proof and a named signatory. CXS 92-1981 adds the product-specific lines a shrimp label has to carry — cooked, partially cooked or raw, and a statement where the product has been glazed with sea-water (Codex Alimentarius Commission, 1981, §6.1). A label change that ignores them is not a design change; it is a specification change.

Run-down and cut-over

The stock plan is where the switch becomes visible. Four positions have to be decided, and one of them is easily forgotten.

Four stock positions and the rule for each
Stock positionRuleWho decidesEvidence
Old stock in your warehouseSell down to the cover date; do not mix lots on the same facing.Buyer and plannerStock report with lot codes.
Old stock in the importer’s nameTitle, risk, payment and any right to return are contract terms; get a written instruction before redirecting.Importer and buyer, with counselContract, Incoterm and written instruction.
New stock in transitHold in quarantine until the first production is released.QualityInspection report and release note.
New stock at the factoryDo not ship against a verbal approval or an unfrozen specification.BuyerSigned sample and specification version.
Shelf and customerNotify; a dual run only with a stated end date.Category and customerPlanogram change and notification record.
The forgotten position is the stock already in the importer’s name. Ecosea diagram; contract points to be confirmed with the importer and counsel.

The forgotten one is the stock already in the importer’s name. Each Incoterms rule names the point at which cost and risk pass, and CIF also puts carriage and insurance with the seller (International Chamber of Commerce, 2020). The rules do not settle title, payment or a right to return; those are contract terms. A buyer who assumes the importer can simply send the old stock back has assumed a term nobody wrote. Ask for the position in writing before the cut-over date is fixed, and confirm the legal reading with the importer and counsel.

The second forgotten item is the shelf itself. Two labels in the same fixture for a short period can be a planned transition or a customer complaint, depending on whether anyone told the customer and set an end date.

What this cannot tell you

What this does not show No timetable, no stock-cover days, no cost of dual running, and no legal position on title or return rights. Each duration belongs to the party that has to confirm it.

Every duration in a transition belongs to a party who has to confirm it: the factory’s production slot, the printer’s plate lead time, the importer’s release, the retailer’s listing change. The article gives the order of the gates, not their length. It also cannot tell you whether a particular contract allows the old stock to be returned; that is a question for the contract and for counsel.

The record is the deliverable. If the switch is challenged six months later, the file that answers is the frozen specification, the signed sample, the approved proof and the stock report with lot codes — not the email chain.

What to do next

  1. Freeze the old specification, sample and label version before the brief. Name one owner for each; an unfrozen version cannot judge a new sample.
  2. Approve the new sample against the frozen version, and record the differences. The route from an approved sample to a production release is set out in the approved-sample-to-production route.
  3. Decide the plate and the proof before the PO. Write down who owns the artwork, who owns the plate and who signs the proof; then treat that signature as the point of no return.
  4. Map the four stock positions and ask about the importer’s stock in writing. If the old stock is in someone else’s name, the answer is a contract question, not a planning assumption. The equivalence test that should precede the switch is in what makes a second supplier equivalent.

A supplier change is a controlled run-out, not a handover. The shelf does not care which factory made the product; it cares whether the next case arrived before the last one sold.

Before the first container

Testing a direct programme? Ecosea can help define the specification, qualify the factory and run a sample against it — so the comparison starts from a real product.

Talk to Ecosea

References

  1. Codex Alimentarius Commission. (1981). Standard for quick frozen shrimps or prawns (CXS 92-1981, revised 1995). Food and Agriculture Organization of the United Nations; World Health Organization. https://www.fao.org/input/download/standards/107/CXS_092e.pdf
  2. Codex Alimentarius Commission. (1985). General standard for the labelling of prepackaged foods (CXS 1-1985, amended 2010). Food and Agriculture Organization of the United Nations; World Health Organization. https://www.fao.org/input/download/standards/32/CXS_001e.pdf
  3. Codex Alimentarius Commission. (2003). Code of practice for fish and fishery products (CXC 52-2003, revised 2011). Food and Agriculture Organization of the United Nations; World Health Organization. https://www.fao.org/input/download/standards/10273/CXP_052e.pdf
  4. International Chamber of Commerce. (2020). Incoterms 2020. https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/
  5. U.S. Food and Drug Administration. (2013). Guidance for industry: A food labeling guide. https://www.fda.gov/regulatory-information/search-fda-guidance-documents/guidance-industry-food-labeling-guide